Product Description
Key Features
- Exact product identity: SIPLUS S7-300 CPU 314C-2PN/DP based on 6ES7314-6EH04-0AB0, with conformal coating.
- Integrated digital I/O: The CPU has 24 digital inputs and 16 digital outputs; 4 outputs are high-speed outputs.
- Communication interfaces: It has 1 MPI/DP interface with 12 Mbps transmission rate and 1 Ethernet PROFINET interface with a 2-port RJ45 switch.
- Work and load memory: Integrated work memory is 192 kbyte and is not expandable. Plug-in MMC load memory is supported up to 8 Mbyte.
- Technological functions: The CPU has 4 counters with a maximum counting frequency of 60 kHz, 4 frequency meters, 4 pulse outputs, controlled positioning, and a PID controller.
Applications
- High-speed counting: The integrated counters support counting frequencies up to 60 kHz.
- Frequency measurement: The CPU provides 4 frequency meters up to 60 kHz.
- Closed-loop control: The integrated function blocks provide a PID controller.
Technical Summary
| Product type | CPU 314C-2 PN/DP |
|---|---|
| Based on | 6ES7314-6EH04-0AB0 |
| Work memory | 192 kbyte |
| Digital inputs | 24 |
| Digital outputs | 16 |
| Analog outputs | 2 |
| PROFINET interface | 1; 2 ports (switch) RJ45 |
| MPI/DP interface | 1; 12 Mbps |
| Supply voltage | 24 V DC |
| Ambient temperature during operation | -25…+70 °C |
| Product lifecycle | Product cancellation |
Frequently Asked Questions
What exact product identity should be confirmed for this Siemens CPU?
Confirm order number 6AG1314-6EH04-7AB0, product type CPU 314C-2 PN/DP, and base product 6ES7314-6EH04-0AB0.
Which interfaces are integrated?
It has 1 MPI/DP interface with 12 Mbps transmission rate and 1 Ethernet PROFINET interface with a 2-port RJ45 switch.
Is the required memory configuration included?
The CPU has 192 kbyte integrated work memory, supports plug-in MMC load memory up to 8 Mbyte, and requires a Micro Memory Card.
What lifecycle information is supplied?
The supplied lifecycle information is Product cancellation. Confirm required quantity, destination, condition preference, and requested date in a verification inquiry.
